2/1/11 - Finished construction work document and had it evaluated. Came up with a legitament materials list using an actual companies catalog. Finished details on dispensers.
2/4/11 - Added the dispensers to the final 3-D layout. Constructed the floating dock in the layout using MaR's guidelines. I really feel like the design is coming along. Also, I started to add in bathroom appliances for the attendant's house.
2/7/11 - Added water to the entire drawing, researched products for piping. Found cleats for dock on the sketch-up warehouse.
2/10/11-2/13/11 - Absent from school, unable to complete/update any work
2/15/11 - Inserted cleats stratigically into the drawing. Kept them close to where there are pumps rather than all around the dock. I should maybe place them all around the dock incase a boat wants to just get inside the attendants house without getting in the way.
2/18/11 - Worked more on the attendants house in my drawing. No roof so far but I made all of the walls with a 2.5" thickness. The house is to be made of bamboo.
2/21/11 - Inserted windows and researched what types of doors to add into the drawing for the attendant house. Resorted in looking up sketup models for doors.
2/24/11 - Found a couple doors to use. Tested how they would fit inside. Also, AN gave me solar powered lamps in sketchup to use in my drawing. They need no external power source or wiring other than energy from the sun, so I can place them anywhere.
3/1/11 - Inserted lamps into my drawing. They are symmetrically placed along each side of the dock, 9 in total. The drawing is getting so large that the file is very slow, making inserting little details into the drawing a slow and difficult process.
3/3/11 - started to layout the roof of the attendant house. Trying to keep a natural wood theme usinga darker stained bamboo
3/7/11 - still working on the roof in my drawing. It might take another period or two to get it perfected because the file is so slow
3/10/11 - completing the roof of the attendant house today. Recieved help from ms green about the ends of the roof
3/15/11 - drawing is mostly complete. Working on the pipes now this week. I have o connect them to each dispenser and sumps.
3/17/11 - had trouble using the follow me command to connect te pipes. Although it is frustrating, I am working on it little by little, showing progress.
3/21/11 - started working on the sump in a separate file so it would be easier to insert it into the master drawing. Inserted actual diagram images into the middle of the sump.
3/25/11 - finished the sump and inserted it into the drawing. Finished a video of the final product. AN informed me that she gave me the wrong lamps but I did not have the time to change them in my drawing so I am leaving the finished final product as is. Getting ready to test using a video and starting outline for FPUs
3/28/11 - getting ready for FPUs starting this week
3/31/11 - FPUs are in action